Free in-home consultation

855-580-8532

Online Request

Free in-home consultation

855-580-8532

Online Request
Bukey remodel - before collage

Start to Finish: Timeline of a Devine Bath Remodel

If you’ve ever considered completing a bathroom renovation in your home, you have probably thought about paint colors, fixtures, what kind of tub you want, and your storage needs. But what about the timeline of that remodel? What goes into the planning, and how long does the remodel take? You may be surprised to learn that it often takes less time than you would expect. In fact, for one Seattle-area couple, Devine Bath helped them achieve their dream bath in just two weeks.

The couple bought their 1936-built home and liked every aspect of its classic design, except the bathroom. The bathroom was extremely outdated and didn’t fit with the couple’s style and aesthetic preferences. The vanity was too small for their storage needs, with poor lighting and cabinetry that featured an outdated style and finish. Not only was the tub unsightly, but it was also too high and difficult to step over, presenting safety and accessibility issues. The outdated bath surround needed to be replaced, and the flooring throughout the entire bathroom didn’t appeal to the couple’s aesthetic preferences.

The homeowners immediately began making bathroom remodel plans, and sought the help of Devine Bath to make their dreams come alive. After the initial in-home consultation, the Devine Bath design team started planning the homeowner’s new bathroom design. The new bathroom would improve accessibility and functionality of the space and remove all of its unsightly, outdated features—all while ensuring the final product matched the aesthetics of the rest of the home.

The main materials chosen for this project included 3x6-inch subway tile on the wall with .5-inch x 6-inch pencil liner accent on the walls and floors, a Delta Linden In2ition showerhead, and a Frameless sliding glass enclosure for the shower. This two-week remodel was a fun and creative project for both the homeowners and the Devine Bath design team. The hex tile on the floor required a very intensive installation process, both in time and labor, but it produced gorgeous results in the end.

The homeowners were extremely pleased with the design choice, the materials used, and the overall installation and remodel process. Perhaps the overall remodeling experience can be best summed up by the homeowners, themselves:

“We remain THRILLED with our new bath and Devine Bath made the process as easy as possible.”

In this timelapse video, you can really see how the bathroom was completely transformed:

The timeline of a bathroom remodel differs for every project, but Devine Bath makes the entire process easier by partnering our customer with a designer and project manager to help with design decisions and ensure the satisfaction from concept through completion. If you are considering a bathroom remodel in Portland or Seattle, or have questions about the process, contact Devine Bath today to schedule a free in-home consultation.

Next Article
Previous Article
Related Posts
Back to top